01.1 / Public Realm / Civic
Tidal Commons
Reclaimed edge. Shared ground.
- Location
- Wellington Harbourside
- Year
- 2024
- Scope
- 4.2 HA Estuary Daylight
- Area
- 4.2 ha
Daylighted tidal estuary and permeable public boardwalk reconnecting stormwater marsh to coastal pedestrian flow.
The brief
A decommissioned stormwater outfall was writing 90 litres per second of raw overflow into a tidal basin that had silted to half its depth. The council needed the capacity back; the neighbours needed the fence to come down. We were asked whether both could be true.
01The daylighted channel at low tide — 40% of the original marsh footprint reconnected. 02Infiltration terraces step down 1:12 toward the harbour edge. 03Seed mix trialed on the neighbouring roof before being broadcast here.
[ Approach ]
Four phases on the ground
01
Read the land
Eighteen months of tide gauges, sediment cores and dawn wading. The old channel was still legible under the silt — so the new estuary follows the historic alignment rather than a straight line, and the outfall was moved rather than enlarged.
02
Sketch the possibilities
Eleven options tested against three hard constraints: flood storage, uninterrupted cycle access, and a saltmarsh species palette that could survive being submerged twice a day. Six were discarded on the third constraint.
03
Grow the proposal
A 1:200 physical model in the studio let us watch the tide come in. Terraced reed beds double as flood storage; the boardwalk rides the crest of each terrace so it never closes.
04
Steward the delivery
Two planting seasons of supervision on site. 41,000 oioi and 9,000 pingao went in by hand across the first winter, and the sedum trays on the boardwalk are now self-seeding.
Outcome
Peak storm storage improved by 34% and the foreshore has not been closed to the public since opening, including through two king tides. The saltmarsh has recorded eleven nesting pairs of oystercatcher in the second season.
- Flood storage gain
- +34%
- Marsh reconnected
- 40% of baseline extent
- Native plants
- 50,000
- Public access
- 2.1 km continuous
Materials
- Reclaimed greywacke fill
- Cedar boardwalk on stainless pin piles
- Oioi / pingao / saltgrass marsh matrix
- Geotextile-weeded basalt gabion steps
Credits
- Lead designer — Isla Vance
- Project architect — Callum Reid
- Planting design — Maya Chen
- Marine structure — Tomas Lindqvist
- Client
- Wellington City Council — Te Atiawa o Te Awa
- Collaborators
- Tonkin & Taylor, Māpua Environmental Ltd
Site model / plan
The model above is generated from this drawing's height field, which is shared between the shader and the CPU so planting lands exactly on the surface.
Have land with a problem worth solving?
Start a conversation